Specs and installation
Material facts and installation details for your contractor.
Material
Installation
Woodium is screwed to a steel frame, wood frame or concrete slab. Plan joint types and positions before you start, keep every screw in one line, and fill butt joints with PU sealant.
| Panel | Screw length | Counterbore |
|---|---|---|
| 11 mm | 32 mm | 3 mm deep |
| 16 and 18 mm | 32 mm | 5 mm deep |
| 22 and 25 mm | 45 mm | 5 mm deep |
Use #7 screws. Keep each screw 25 mm from the panel edge.
On site
Start from the bottom row.
Fischer #6 or #8 plugs.
Store flat and dry.
Standard woodworking tools.
Every step, with drawings.
Enquiry
Tell us your city, where the panels will go and roughly how much area. We will get back to you soon with a price.